Project

General

Profile

Daily Report 2016 09 12 » History » Version 6

« Previous - Version 6/15 (diff) - Next » - Current version
Redmine Admin, 09/12/2016 03:04 PM


Daily Report 2016 09 19


Flight Plans for the next days

  • 15 September: HALO Transfer flight to Iceland
  • 17 September: Falcon Tranfer flight to Iceland
Transfer provides some flexibility to pursue NAWDEX aims:
  • Overflight of surface stations
  • Instrument calibration (radar) pattern
  • Dropsonde transmission check
  • (adapted pattern in case of interesting weather situation)

Weather Summary

See flight planning meeting slides of today: NAWDEX_Flight_Planning_Meeting_12092016.pdf

  • Weather systems on Thu do not look promising for NAWDEX aims > plan for transfer with overflights and without extending the flight
  • Low total cloud coverage predicted for Jülich and Chilbolton for Thursday, 12 UTC
  • Clouds at all altitude predicted near Icleland and Buoy K7
  • Wind speeds and wave heights are predicted to be low near Buoy 7 > plan for calibration circle near buoy K7
  • Saturday is a transition day until the next system arrives Sun/Mon (former tropical cyclone)

Planning Summary

Here we will add a short summary about the planning meeting of the day
Here we will add the planning material as attached documents
  • Planning Meeting presentation

Instrument summary

Here we will add a short summary about the status of the instruments
  • HALO:
  • Falcon:

Mission summary

On a Mission day you will find the Mission summary by the Mission PI here


Campaign Report: A view in NAWDEX world on XX Sep by X