h1. Daily Report 2016 09 17
2 1 Andreas Schäfler
3 1 Andreas Schäfler
----
4 1 Andreas Schäfler
5 1 Andreas Schäfler
h2. Flight Plans for the next days
6 1 Andreas Schäfler
7 1 Andreas Schäfler
_Here we will add the flight plans_
8 1 Andreas Schäfler
9 1 Andreas Schäfler
10 1 Andreas Schäfler
----
11 1 Andreas Schäfler
12 1 Andreas Schäfler
h2. Weather Summary
13 3 Julian Quinting
14 4 Christian Grams
A deep ridge over the eastern North Atlantic, a trough over the western North Atlantic and a potential vorticity streamer over western Europe characterize the large-scale flow on 17 September. This trough-ridge-trough couplet is moving slowly eastward, and a rather zonal flow is establishing until 19 September over the North Atlantic. Current ECMWF forecasts predict the development of a secondary low-pressure system on Tuesday and Wednesday in this zonal flow to the west of Ireland. This low pressure system is associated with a warm-conveyor belt on its eastern flank which contributes to a deflection of the upper-tropospheric PV gradient on 21 September. Since the WCB outflow and the midlatitude jet are predicted to be close to Iceland this synoptic situation seems to be ideal for flights on Wednesday. Depending on the further development, synchronized flights of the DLR-Falcon and HALO could be considered. Detailed planning to be done during the next days.
15 1 Andreas Schäfler
16 2 Julian Quinting
Current forecasts show a further rapid cyclogenesis and downstream ridge building to the south and east of Iceland at the end of next week. This setup would allow flights into WCB outflow to the north of Iceland. However, the development of the low pressure system and of the downstream flow is still highly uncertain. Thus, upcoming forecasts will be studied intensively concerning the exact development.
17 1 Andreas Schäfler
18 1 Andreas Schäfler
----
19 1 Andreas Schäfler
20 1 Andreas Schäfler
h2. Planning Summary
21 1 Andreas Schäfler
22 1 Andreas Schäfler
_Here we will add a short summary about the planning meeting of the day
23 1 Andreas Schäfler
Here we will add the planning material as attached documents_
24 1 Andreas Schäfler
* _Planning Meeting presentation_
25 1 Andreas Schäfler
26 1 Andreas Schäfler
----
27 1 Andreas Schäfler
28 1 Andreas Schäfler
h2. Instrument summary
29 1 Andreas Schäfler
30 1 Andreas Schäfler
_Here we will add a short summary about the status of the instruments_
31 1 Andreas Schäfler
* _HALO:_
32 1 Andreas Schäfler
* _Falcon:_
33 1 Andreas Schäfler
34 1 Andreas Schäfler
----
35 1 Andreas Schäfler
36 1 Andreas Schäfler
h2. Mission summary
37 1 Andreas Schäfler
38 1 Andreas Schäfler
_On a Mission day you will find the Mission summary by the Mission PI here_
39 1 Andreas Schäfler
40 1 Andreas Schäfler
----
41 1 Andreas Schäfler
42 1 Andreas Schäfler
h2. [[Campaign Report]]: A view in NAWDEX world on XX Sep by X