1 1 Andreas Schäfler
h1. Planning Procedures
2 1 Andreas Schäfler
3 39 Andreas Schäfler
---
4 39 Andreas Schäfler
5 1 Andreas Schäfler
h2. (1) NAWDEX Field Phase
6 1 Andreas Schäfler
7 1 Andreas Schäfler
 * *Flight Planning Phase:*
8 37 Andreas Schäfler
 ** 12 September – 19 October 2016 
9 37 Andreas Schäfler
 ** first possible flight: 19 Sep 2016 
10 37 Andreas Schäfler
 ** last possible flight: 16 Oct 2016
11 50 Andreas Schäfler
 ** every 7th workday is a day off for ALL
12 1 Andreas Schäfler
13 1 Andreas Schäfler
 * *Transfers:* 
14 37 Andreas Schäfler
 ** HALO:      Thu, 15 September (to Keflavik) and Wed, 19 October (to OP)
15 37 Andreas Schäfler
 ** Falcon:    Sat, 17 September (to Keflavik) and Wed, 19 October (to OP) 
16 1 Andreas Schäfler
17 1 Andreas Schäfler
18 38 Andreas Schäfler
---
19 1 Andreas Schäfler
20 2 Andreas Schäfler
h2. (2) Information Transfer 
21 1 Andreas Schäfler
22 1 Andreas Schäfler
 * *NAWDEX Campaign Wiki*
23 37 Andreas Schäfler
 ** Information about daily schedule, flight plans, weather etc. is communicated via the NAWDEX Wiki
24 37 Andreas Schäfler
 ** The NAWDEX Wiki is editable by all participants (upon registration)
25 40 Andreas Schäfler
 ** People that do not want to edit the page can send Information to a technical manager  
26 37 Andreas Schäfler
 ** The *Wiki’s main page* shows all essential information on: a Daily Schedule, the responsibilities, a planning summary matrix and instrument status 
27 37 Andreas Schäfler
 ** All documents will be made available on the NAWDEX wiki page, daily reports are linked on separate campaign day pages: e.g.  https://internal.wavestoweather.de/nawdex/projects/nawdex/wiki/Daily_Report_2016_09_19  
28 37 Andreas Schäfler
 ** The Wiki provides *templates* for all reports: https://internal.wavestoweather.de/nawdex/projects/nawdex/wiki/Templates
29 2 Andreas Schäfler
30 1 Andreas Schäfler
 * *NAWDEX broadcasting via Adobe Connect*
31 45 Andreas Schäfler
 ** Meetings will be available via live stream with the *Adobe Connect System * (https://webconf.vc.dfn.de/nawdex/)
32 37 Andreas Schäfler
 ** It will not be possible of oral contributions for people outside Iceland. A real-time messaging will be available during the Meetings. 
33 37 Andreas Schäfler
    People from outside are welcome to send information to the Operation Center or a call  during the day.
34 20 Andreas Schäfler
35 39 Andreas Schäfler
---
36 39 Andreas Schäfler
37 34 Andreas Schäfler
h2. (3) Daily Schedule	
38 34 Andreas Schäfler
39 34 Andreas Schäfler
 * *General planning Meeting* (every day at 11 UTC, 13 CEST) : max. 60 Min
40 34 Andreas Schäfler
41 34 Andreas Schäfler
   ** +Aim+: inform all participants about scientific plans and tentative flight plans, decide all open issues in coordination with the instrument groups and flight facility
42 34 Andreas Schäfler
   ** +Structure:+
43 37 Andreas Schäfler
   *** Key information from previous flight (2 minutes)
44 37 Andreas Schäfler
   *** Aircraft status report by FX-Operations
45 37 Andreas Schäfler
   *** Instrument status report by Instrument Manager 
46 37 Andreas Schäfler
   *** Short weather summary:  information about flight options for the next days and update for planning for the next day with the latest forecast
47 37 Andreas Schäfler
   *** Final discussion about flight pattern for next day (in case of 2 options)
48 37 Andreas Schäfler
   *** Announcement of tentative plans for Day+3 
49 51 Andreas Schäfler
   *** Coordination with other aircraft (Input from other groups)
50 37 Andreas Schäfler
   *** Demand of ground-based obs (organized by Ground-Based Observation coordinator)
51 19 Andreas Schäfler
   ** Presentation and discussion led by the Scientific Manager
52 1 Andreas Schäfler
   ** After the general meeting FX (pilots, operations) and the mission scientists work on filing flight plans
53 23 Andreas Schäfler
54 34 Andreas Schäfler
55 53 Redmine Admin
 * *Weather discussion* (every day at 17 UTC, 19 CEST)
56 34 Andreas Schäfler
57 34 Andreas Schäfler
   ** +Aims+: 
58 37 Andreas Schäfler
   *** Wrap up of the discussion within the forecast team during the day
59 37 Andreas Schäfler
   *** Scientific discussion about options for the upcoming days, contribution by different groups
60 37 Andreas Schäfler
   *** Update of flight planning Matrix
61 37 Andreas Schäfler
   *** Presentation of  tentative flight plans (to be filed in detail on next morning)
62 37 Andreas Schäfler
   *** Discussion about coordination of aircraft
63 37 Andreas Schäfler
   *** Decision on responsibilities
64 1 Andreas Schäfler
   ** Campaign steering Group must be present to decide on what plans will be priority for the next morning 
65 25 Andreas Schäfler
   ** Presentation by chief forecaster supported by an assistant 
66 1 Andreas Schäfler
67 25 Andreas Schäfler
 * *Quick-Look Meeting* 
68 25 Andreas Schäfler
69 37 Andreas Schäfler
   ** depending on the schedule quick-look Meetings will be held after the research flights and when instrument groups had enough time to prepare quicklooks
70 37 Andreas Schäfler
   ** after or before the flight planning meeting
71 37 Andreas Schäfler
   ** should be organized by the instrument manager (collect presentations)
72 25 Andreas Schäfler
73 25 Andreas Schäfler
 * *Debriefing*
74 25 Andreas Schäfler
75 25 Andreas Schäfler
    *** Will be held after the research flights at the Airport
76 1 Andreas Schäfler
    *** Pilots and mission scientists
77 32 Andreas Schäfler
78 39 Andreas Schäfler
---
79 25 Andreas Schäfler
80 35 Andreas Schäfler
h2. (4) Responsibilities
81 35 Andreas Schäfler
82 41 Andreas Schäfler
In the following several positions are described that are defined to organize the planning team. The positions are thought to rotate every 2-3 days.
83 41 Andreas Schäfler
84 1 Andreas Schäfler
 * *HALO/Falcon Campaign Steering Group:*
85 40 Andreas Schäfler
   
86 40 Andreas Schäfler
   ** Group of 5 people that reach a final decision if needed (in case of different opinions) 
87 40 Andreas Schäfler
   ** Scientific Manager, Chief Forecaster, Instrument Manager, 2 NAWDEX Scientific steering group members
88 40 Andreas Schäfler
89 1 Andreas Schäfler
 * *Scientific Manager:*
90 40 Andreas Schäfler
91 40 Andreas Schäfler
   ** central contact person that knows all about the planning activities of the upcoming days
92 54 Redmine Admin
   ** chairs the general planning meeting and the weather discussion
93 40 Andreas Schäfler
   ** guides the decision making process 
94 40 Andreas Schäfler
   ** Deliverables:
95 55 Redmine Admin
   *** Chair of the General Meeting and Weather Discussion
96 40 Andreas Schäfler
   *** planning summary matrix (gives an overview of plans for upcoming days, see Wiki-page for an example)
97 40 Andreas Schäfler
   *** daily schedule (in coordination with DLR-FX operations)
98 40 Andreas Schäfler
   *** list of responsibilities on NAWDEX wiki page 
99 40 Andreas Schäfler
   *** planning summary: a document that summarizes the planning process of the day and discussion at the meetings with focus on plans / changes / discussion Topics
100 40 Andreas Schäfler
101 1 Andreas Schäfler
 * *Chief Forecaster:*
102 40 Andreas Schäfler
103 40 Andreas Schäfler
   ** coordinates the forecasting team:
104 1 Andreas Schäfler
   *** collects information from forecasting group
105 1 Andreas Schäfler
   *** provides information to mission scientists 
106 55 Redmine Admin
   *** presents the plans and weather at the General Meeting and in the Weather Discussion
107 40 Andreas Schäfler
   ** Deliverables: 
108 55 Redmine Admin
   *** Presentations
109 55 Redmine Admin
   *** Weather Summary: document on the weather situation of the day
110 42 Andreas Schäfler
111 42 Andreas Schäfler
 * *Assistant Chief Forecaster:*
112 42 Andreas Schäfler
113 42 Andreas Schäfler
   ** supports the chief forecaster
114 42 Andreas Schäfler
   ** prepares weather summary 
115 42 Andreas Schäfler
116 36 Andreas Schäfler
 * *Technical Manager:*
117 40 Andreas Schäfler
 
118 40 Andreas Schäfler
   ** Organizes the meetings (on-time start, infrastructure (computer, video projector, streaming via Adobe Connect System)
119 40 Andreas Schäfler
   ** Takes care of NAWDEX wiki (updates of main page, presentations, summaries, pictures)
120 40 Andreas Schäfler
   ** Collects reports
121 40 Andreas Schäfler
 
122 36 Andreas Schäfler
 * *Instrument Manager:*
123 40 Andreas Schäfler
 
124 40 Andreas Schäfler
   ** Collects information from all instrument PI’s on current isntrument status 
125 40 Andreas Schäfler
   ** A person from the instrument groups
126 40 Andreas Schäfler
   ** Deliverables: 
127 40 Andreas Schäfler
   *** Instrument summary (summary of the instrument status of the day, describe possible work on instruments)
128 40 Andreas Schäfler
   *** Instrument status table (overview of instrument status that is provided on the Wiki page)
129 40 Andreas Schäfler
 
130 36 Andreas Schäfler
 * *Mission Scientists*
131 40 Andreas Schäfler
132 40 Andreas Schäfler
   ** 1-3 persons (1 per aircraft, 1 at the ground) that are responsible to conduct a mission
133 40 Andreas Schäfler
   ** Deliverables
134 40 Andreas Schäfler
   *** Pre-flight: Develop the flight plans with pilots and operations, define release locations for dropsondes, provide flight plan to technical manager for upload to Wiki-page 
135 40 Andreas Schäfler
   *** Mission on-board: in-flight decisions HALO: communication with ground, dropsonde releases, Falcon: wind lidar operator
136 40 Andreas Schäfler
   *** Mission ground: monitors PLANET chat during the research flight, upload of most recent satellite images
137 40 Andreas Schäfler
   *** Post-flight: mission summary (document that summarizes all events during a flight including onboard/ground)
138 40 Andreas Schäfler
 
139 36 Andreas Schäfler
 * *Coordinator for Ground-Based Observations:*
140 40 Andreas Schäfler
 
141 40 Andreas Schäfler
  ** Distributes information to all ground-based observation facilities
142 40 Andreas Schäfler
  ** Activation of additional radiosonde observations *_(more Information will follow)_*
143 40 Andreas Schäfler
 
144 40 Andreas Schäfler
 * *DLR Flight Facility:* coordination of flights and flight planning with pilots 
145 40 Andreas Schäfler
  
146 40 Andreas Schäfler
  ** Katrin Witte (Project engineer DLR-FX, katrin.witte[at]dlr.de)
147 40 Andreas Schäfler
  ** Andreas Minikin (Project engineer DLR-FX, andreas.minikin[at]dlr.de)
148 40 Andreas Schäfler
  ** Frank Probst (DLR-FX Operations, Frank.Probst[at]dlr.de)
149 40 Andreas Schäfler
  ** Stefan Hempe (DLR-FX Operations, Stefan.Hempe[at]dlr.de)
150 40 Andreas Schäfler
151 36 Andreas Schäfler
 * *Campaign Reporter:*
152 1 Andreas Schäfler
153 40 Andreas Schäfler
  ** Creates the campaign diary that will be provided on the Wiki page
154 40 Andreas Schäfler
  ** Position can be filled by all volunteers: PhD student, instrument operator, radiosonde operator,…
155 40 Andreas Schäfler
  ** Deliverables: Create a short blog contribution that shows the day from different perspectives Collect some pictures of the day
156 40 Andreas Schäfler
  ** Here is an example that gives a rough idea http://blogs.esa.int/campaignearth/2015/05/20/windval-petta-reddast/ 
157 40 Andreas Schäfler
158 40 Andreas Schäfler
---
159 40 Andreas Schäfler
160 36 Andreas Schäfler
h2. (5) Coordination with other Aircraft/Ground-Based Observation:
161 36 Andreas Schäfler
162 36 Andreas Schäfler
 * *French Falcon*
163 36 Andreas Schäfler
164 36 Andreas Schäfler
    *** French Falcon obervation period: 29 Sep – 17 Oct
165 47 Andreas Schäfler
    *** French Falcon transfers: Wed, 28 Sept (to Keflavic) and 17 Oct back to Toulouse
166 36 Andreas Schäfler
    *** Contacts: Julien Delanoe (LATMOS/IPSL/UVSQ), Gwendal Rivière (LMD-ENS), Philippe Arbogast (Météo France)
167 36 Andreas Schäfler
    *** The French planning team will stay with us in the operation center near the Airport
168 36 Andreas Schäfler
    *** _procedure on the exchange of information and regular meetings has to be discussed (should be done before the HALO/Falcon General Meeting starts)_**
169 36 Andreas Schäfler
    *** The Scientific Manager will be the contact person from our side 
170 36 Andreas Schäfler
171 36 Andreas Schäfler
 * *Global Hawk / SHOUT*
172 36 Andreas Schäfler
173 36 Andreas Schäfler
    *** Global Hawk: (Jim, please add exact dates with overlap), 
174 36 Andreas Schäfler
    *** Contacts: Jim Doyle (NRL) will coordinate the exchange of information with the SHOUT team, Jason Dunion (NOAA)
175 36 Andreas Schäfler
    *** Daily coordination calls from XX Sep to XX Oct at XX UTC
176 36 Andreas Schäfler
 
177 1 Andreas Schäfler
* *UK BAE 146*
178 1 Andreas Schäfler
179 1 Andreas Schäfler
    *** Operates from Cranfield 
180 1 Andreas Schäfler
    *** Operation period: 19-30 September, 9-16 October, 2-3 double-flight missions), 
181 1 Andreas Schäfler
    *** Contact: John Methven (U Reading)
182 46 Andreas Schäfler
    *** Daily coordination calls from XX Sep to XX Oct at 0830 UTC
183 1 Andreas Schäfler
 
184 1 Andreas Schäfler
* *Ground-based observations _(this section needs to be specified)_*
185 1 Andreas Schäfler
186 1 Andreas Schäfler
    ** Managed by the ground-based observation coordinator
187 1 Andreas Schäfler
    ** +Observations:+
188 1 Andreas Schäfler
    *** DLR radiosondes (operated by M. Bramberger, from )
189 1 Andreas Schäfler
    *** France: 
190 49 Andreas Schäfler
    **** Lannion (Brittany, France): jean-marie.donier[at]meteo.fr (UHF), Pierre.bosser[at]ensta-bretagne.fr (GPS station) and julien.delanoe[at]latmos.ipsl.fr (cloud radars)
191 49 Andreas Schäfler
    **** Cloud radar and RS in SIRTA (near Paris, France) (lidar and other remote sensing instruments available): contact: jean-charles.dupont[at]ipsl.polytechnique.fr). 
192 48 Andreas Schäfler
    **** Iceland: Cloud radar and mini lidar to be deployed during French campaign)
193 1 Andreas Schäfler
    *** Canada: 
194 1 Andreas Schäfler
    **** automatic 6-hourly releases from 19 Sep - 17 Oct
195 1 Andreas Schäfler
    **** *_(add list os Station names)_*   
196 1 Andreas Schäfler
    *** UK:
197 1 Andreas Schäfler
    **** Contact: Geraint Vaughan
198 1 Andreas Schäfler
    **** *_(add some Information on Aberystwyth super site)_*   
199 1 Andreas Schäfler
    *** Norway:
200 1 Andreas Schäfler
    *** EUMETNET: in case of a positive vote for our proposal (decision expected for 1 Sep 2016) we will add the procedure for on-demand radiosondes within the European network
201 40 Andreas Schäfler
202 1 Andreas Schäfler
---
203 1 Andreas Schäfler
204 42 Andreas Schäfler
h2. (6) Reports:
205 42 Andreas Schäfler
206 42 Andreas Schäfler
A number of reports will be created to document weather and planning process. They will be uploaded to the Wiki every day so that all people can follow the campaign in Iceland.
207 42 Andreas Schäfler
The reports include:
208 42 Andreas Schäfler
209 42 Andreas Schäfler
* Weather Summary (written by chief forecaster and assistant)
210 42 Andreas Schäfler
* Planning Summary (written by science manager)
211 42 Andreas Schäfler
* Mission Report (written by mission scientist ground/air)
212 42 Andreas Schäfler
* Instrument Report (written by the instruemnt manager)
213 42 Andreas Schäfler
214 42 Andreas Schäfler
All templates can be found at: https://internal.wavestoweather.de/nawdex/projects/nawdex/wiki/Templates