Project

General

Profile

Wiki » History » Version 112

« Previous - Version 112/389 (diff) - Next » - Current version
Manuel Gutleben, 09/20/2016 10:53 AM


NAWDEX 2016 Campaign (HALO & Falcon)

This is the official blog for the NAWDEX campaign, a webpage that can be edited by all NAWDEX team members that are registered. The aim is to inform all NAWDEX participants and interested colleagues about the campaign and to share the planning material. If you need information about the international NAWDEX Project please refer to http://nawdex.org/ and for the HALO/Falcon Project please refer to http://www.pa.op.dlr.de/nawdex/

In case you should have any questions please contact: andreas.schaefler[at]dlr.de


NAWDEX daily campaign schedule

[last change: 19 Sep, 2016, 16:35 UT]

If not stated otherwise, all timings given below after September 18 are referring to UT, which is LT in Iceland.


Wednesday, Sept 21, 2016

  • Tentative schedule:
  • DLR Falcon

12:15 --- Power on the aircraft
13:25 --- Power off
13:35 --- Leave hangar / APU power / refueling
14:50 --- Take-Off

Meeting with HALO at N 66°42' W 18°18' at 15:25 UTC

ETA Keflavik: 18:30 UTC

  • DLR HALO,

10:00 --- Power on the aircraft
12:25 --- Power off
12:30 --- Leave hangar / APU power / refueling
13:45 --- Take-Off

Satellite Overpass at N 65°00' W 22°00' at 14:40 UTC
Meeting with DLR Falcon at N 66°42' W 18°18' at 15:25 UTC

ETA Keflavik: 18:45 UTC

Tuesday, Sept 20, 2016

Aircraft

  • Falcon

10:00-19:30 --- Access to aircraft / power on the aircraft

  • HALO

10:00-19:30 --- Access to aircraft / power on the aircraft
10:15 Briefing at the aircraft for planning of instrument work on the day

Responsibilities

Position Name Contact (Email) mobile phone
HALO/Falcon Campaign Steering Group: X X X
Scientific Manager: George Craig george.craig[at]lmu.de X
Technical Manager: X X X
Chief Forecaster: Christian Grams christian.grams[at]env.ethz.ch X
Instrument Manager: Manuel Gutleben manuel.gutleben[at]dlr.de X
Coordinator Ground-Based Observations: Ben Harvey b.j.harvey[at]reading.ac.uk X
Mission Scientist (D-CMET) 21. Sep Oliver Reitebuch X X
Mission Scientist (D-ADLR) 21. Sep Florian Pantillon florian.pantillon[at]kit.edu X
Mission Scientist (ground) 21. Sep Julian Quinting julian.quinting[at]monash.edu X
DLR-FX Operations Frank Probst frank.probst[at]dlr.de +49 152 015 22 498
DLR-FX Project manager in Keflavik (until Sep 30) Andreas Minikin andreas.minikin[at]dlr.de +49 174 951 1618
DLR-FX Project manager in Keflavik (from Sep 30) Katrin Witte katrin.witte[at]dlr.de +49 172 741 3066

Planning Summary Matrix (from 19 Sep 2016, 23:25 UTC)


Instrument Status Matrix (from 20 Sep 2016, 08:00 UTC)


Observation Coordination Matrix( from XX Sep 2016, XX:XX UTC)