Project

General

Profile

Wiki » History » Version 314

Julian Quinting, 10/11/2016 10:05 PM

1 92 Redmine Admin
h1. NAWDEX 2016 Campaign (HALO & Falcon)
2 2 Redmine Admin
3 72 Andreas Schäfler
This is the official blog for the NAWDEX campaign, a webpage that can be edited by all NAWDEX team members that are registered. The aim is to inform all NAWDEX participants and interested colleagues about the campaign and to share the planning material. If you need information about the international NAWDEX Project please refer to http://nawdex.org/ and for the HALO/Falcon Project please refer to http://www.pa.op.dlr.de/nawdex/
4 23 Andreas Schäfler
5 91 Andreas Minikin
In case you should have any questions please contact: *andreas.schaefler[at]dlr.de*
6 42 Andreas Schäfler
7 91 Andreas Minikin
---
8 1 Redmine Admin
9 91 Andreas Minikin
h2. NAWDEX daily campaign schedule 
10 1 Redmine Admin
11 313 Katrin Witte
_[last change: 11 Oct, 2016, 20:35 UT]_
12 1 Redmine Admin
13 1 Redmine Admin
If not stated otherwise, all timings given below after September 18 are referring to UT, which is LT in Iceland.
14 298 Katrin Witte
15 298 Katrin Witte
---
16 298 Katrin Witte
17 307 Katrin Witte
h3. Wednesday, Oct 12, 2016 
18 298 Katrin Witte
19 298 Katrin Witte
*Aircraft schedule:* 
20 298 Katrin Witte
21 1 Redmine Admin
* *%{color:red} DLR Falcon%*
22 1 Redmine Admin
>
23 307 Katrin Witte
>13:00 --- Power on the aircraft
24 308 Katrin Witte
>15:20 --- Pulling the aircraft out of the Hangar
25 311 Katrin Witte
>16:00 --- *Take-Off* (approx. flight time 3:30h)
26 311 Katrin Witte
>19:30 --- *Landing*
27 1 Redmine Admin
>
28 307 Katrin Witte
*Scientific Crew:* B. Witschas, C. Lemmerz
29 307 Katrin Witte
>
30 307 Katrin Witte
>"Falcon ATC Map":https://internal.wavestoweather.de/nawdex/attachments/download/401/Map%20ATC%20D-CMET%20-%2012-10-2016.pdf
31 307 Katrin Witte
>"Falcon Flight Plan":https://internal.wavestoweather.de/nawdex/attachments/download/402/Flightplan%20D-CMET%20%2012-10-2016.pdf
32 307 Katrin Witte
>
33 1 Redmine Admin
*%{color:green}Meeting times for entry into the airport at Silver Gate%* 
34 1 Redmine Admin
>
35 307 Katrin Witte
%{color:green} **12:45** E. Nagel, B. Witschas, C. Lemmerz, O. Lux, D. Woudsma ; Shuttle from Gate to Terminal: Engelbert%
36 310 Katrin Witte
%{color:green} **14:15** R. Welser, S. Grillenbeck, M. Zöger ; Shuttle from Gate to Terminal: Katrin%
37 1 Redmine Admin
>
38 1 Redmine Admin
* *%{color:red} DLR HALO%*
39 298 Katrin Witte
>
40 307 Katrin Witte
>10:15 --- Power on the aircraft
41 307 Katrin Witte
>12:35 --- Pushing the aircraft out of the Hangar, Scientific briefing in the hangar
42 307 Katrin Witte
>13:35 --- *Take-off* (approx. flight time: 07:30h)
43 307 Katrin Witte
>21:05 --- *Landing*
44 1 Redmine Admin
>
45 307 Katrin Witte
*Scientific Crew:* F. Ewald (PI), T. Koelling, S. Groß, D. Ene, B. Brügmann, M. Jacob
46 1 Redmine Admin
47 307 Katrin Witte
>"HALO ATC Map":https://internal.wavestoweather.de/nawdex/attachments/download/404/02%20%20Map%20ATC%20D-ADLR%20%20%2012-10-2016.pdf
48 307 Katrin Witte
>"HALO Flight Plan":https://internal.wavestoweather.de/nawdex/attachments/download/403/12%20%20Flightplan%20D-ADLR%20%20%2012-10-2016.pdf
49 1 Redmine Admin
>
50 1 Redmine Admin
*%{color:green}Meeting times for entry into the airport at Silver Gate%* 
51 1 Redmine Admin
>
52 313 Katrin Witte
%{color:green} **09:45** C. Grad, K. Witte, S. Storhas M. Wirth, M. Gutleben, M. Klingebiel, H. Konow, L. Hirsch, K. Wolf, T. Carlsen ; Shuttle from Gate to Terminal: Katrin, Manuel%
53 307 Katrin Witte
%{color:green} **11:30** L. Höppler, T. Koelling; Shuttle from Gate to Terminal: Katrin%
54 309 Katrin Witte
%{color:green} **12:15** S. Gemsa, M. Grossrubatscher, C. Mallaun, S. Hempe, F. Ewald, S. Groß, D. Ene, B. Brügmann, M. Jacob; Shuttle from Gate to Terminal: Christian, Katrin%
55 1 Redmine Admin
>
56 312 Katrin Witte
* *%{color:red} Radio Sondes%*
57 312 Katrin Witte
>
58 312 Katrin Witte
>07:30 --- Work in the hangar
59 312 Katrin Witte
>08:00 --- Start of 1st Radio Sonde
60 312 Katrin Witte
>14:00 --- Start of 2nd Radio Sonde
61 1 Redmine Admin
62 312 Katrin Witte
>
63 312 Katrin Witte
*%{color:green}Meeting times for entry into the airport at Silver Gate%* 
64 312 Katrin Witte
>
65 312 Katrin Witte
%{color:green} **07:15** M. Bramberger, A. Senica, J. Quinting, M. Röthlisberger; Shuttle from Gate to Terminal: South Air%
66 307 Katrin Witte
67 307 Katrin Witte
---
68 307 Katrin Witte
69 307 Katrin Witte
h3. Tuesday, Oct 11, 2016 
70 307 Katrin Witte
71 307 Katrin Witte
*Aircraft schedule:* 
72 307 Katrin Witte
73 307 Katrin Witte
* *%{color:red} DLR Falcon%*
74 307 Katrin Witte
>
75 307 Katrin Witte
>*No flight!*
76 307 Katrin Witte
>Work on ground.
77 307 Katrin Witte
>
78 307 Katrin Witte
*%{color:green}Meeting times for entry into the airport at Silver Gate%* 
79 307 Katrin Witte
>
80 307 Katrin Witte
%{color:green} **09:15** E. Nagel, D. Woudsma ; Shuttle from Gate to Terminal: Engelbert%
81 307 Katrin Witte
>
82 307 Katrin Witte
* *%{color:red} DLR HALO%*
83 307 Katrin Witte
>
84 307 Katrin Witte
>*Flight got cancelled because of some problems in Cranfield. It should have been a coordinated flight with FAAM!*
85 307 Katrin Witte
>Work on ground. Fueling.
86 73 Andreas Minikin
87 73 Andreas Minikin
---
88 100 Christian Grams
89 166 Heini Wernli
h2. Responsibilities
90 260 Julian Quinting
91 157 Heini Wernli
| *Position* | *Name* | *Contact (Email*) | *mobile phone* |
92 286 Julian Quinting
| HALO/Falcon Campaign Steering Group:|  X | X | X |
93 314 Julian Quinting
| Scientific Manager: | Andreas Schaefler | andreas.schaefler[at]dlr.de | X |
94 279 Julia Mack
| Technical Manager: | X |  X | X |
95 314 Julian Quinting
| Chief Forecaster: | Paolo Ghinassi | pghinass[at]uni-mainz.de | X |
96 278 Julia Mack
| Instrument Manager: | Manuel Gutleben |  manuel.gutleben[at]dlr.de | X |
97 279 Julia Mack
| Coordinator Ground-Based Observations: | Lucas Hoeppler | lucas.hoeppler[at]physik.uni-muenchen.de | X |
98 235 Frank Probst
| Mission Scientist (D-CMET) | Benjamin Witschas| benjamin.witschas[at]dlr.de | +354 8668270 |
99 314 Julian Quinting
| Mission Scientist (D-ADLR) | Florian Ewald | florian.ewald[at]dlr.de | X |
100 314 Julian Quinting
| Mission Scientist (ground) | Roman Attinger | roman.attinger[at]env.ethz.ch | X |
101 47 Andreas Schäfler
| DLR-FX Operations | Stefan Hempe| stefan.hempe[at]dlr.de | +49 172 20 00 688 |
102 101 Christian Grams
| DLR-FX Project Manager | Katrin Witte | katrin.witte[at]dlr.de | +49 172 741 3066 |
103 44 Andreas Schäfler
 
104 101 Christian Grams
105 123 Christian Grams
----
106 1 Redmine Admin
107 47 Andreas Schäfler
h2. Planning Summary Matrix (from 19 Sep 2016, 23:25 UTC)
108 112 Manuel Gutleben
109 254 Manuel Gutleben
110 302 Manuel Gutleben
111 254 Manuel Gutleben
----
112 302 Manuel Gutleben
113 47 Andreas Schäfler
h2. Instrument and Aircraft Status Matrix (from 11 Okt 2016, 09:00 UTC)
114 45 Andreas Schäfler
115 45 Andreas Schäfler
!{width:60%}NAWDEX_instrument_status_matrix_20161011.png!
116 1 Redmine Admin
117 1 Redmine Admin
----
118 1 Redmine Admin
119 1 Redmine Admin
h2. Observation Coordination Matrix( from XX Sep 2016, XX:XX UTC)
120 1 Redmine Admin
121 1 Redmine Admin
!{width:60%}NAWDEX_observation_coordination_matrix_2016XXXX.png!