NAWDEX 2016 Campaign (HALO & Falcon)¶
This is the official blog for the NAWDEX campaign, a webpage that can be edited by all NAWDEX team members that are registered. The aim is to inform all NAWDEX participants and interested colleagues about the campaign and to share the planning material. If you need information about the international NAWDEX Project please refer to http://nawdex.org/ and for the HALO/Falcon Project please refer to http://www.pa.op.dlr.de/nawdex/
In case you should have any questions please contact: andreas.schaefler[at]dlr.de
NAWDEX daily campaign schedule¶
[last change: 12 Oct, 2016, 15:20 UT]
If not stated otherwise, all timings given below after September 18 are referring to UT, which is LT in Iceland.
Thursday, Oct 13, 2016¶
Aircraft schedule:
- DLR Falcon
2 Flights planned for Thursday
09:45 --- Power on the aircraft
11:50 --- Pulling the aircraft out of the Hangar
12:35 --- Take-Off (approx. flight time 3:00h)
15:35 --- LandingScientific Crew: B. Witschas, C. Lemmerz
"Falcon ATC Map":
"Falcon Flight Plan":17:30 --- Take-Off (approx. flight time 3:30h)
21:00 --- LandingScientific Crew: B. Witschas, O. Lux
"Falcon ATC Map":
"Falcon Flight Plan":
Meeting times for entry into the airport at Silver Gate
09:15 E. Nagel, B. Witschas, C. Lemmerz, O. Lux, D. Woudsma ; Shuttle from Gate to Terminal: Engelbert
10:45 R. Welser, S. Grillenbeck, M. Zöger ; Shuttle from Gate to Terminal: Katrin
- DLR HALO
04:45 --- Power on the aircraft
07:00 --- Pulling the aircraft out of the Hangar
08:00 --- Take-Off (approx. flight time 08:45h)
16:45 --- LandingScientific Crew: PI tbd?, L. Hirsch, M. Klingebiel, S. Groß, M. Gutleben, K. Wolf
"HALO ATC Map":
"HALO Flight Plan":
Meeting times for entry into the airport at Golden Gate
04:15 K. Witte, C. Grad, M. Wirth, D. Ene, H. Konow, B. Brügmann, M. Jacob; Shuttle from Gate to Terminal: Katrin
05:45 T. Koelling, T. Carlsen; Shuttle from Gate to Terminal: Katrin
Meeting times for entry into the airport at Silver Gate
06:45 S. Gemsa, M. Grossrubatscher, T. Leder, C. Mallaun, PI tbd, L. Hirsch, M. Klingebiel, S. Groß, M. Gutleben, K. Wolf; Shuttle from Gate to Terminal: Katrin
Wednesday, Oct 12, 2016¶
Aircraft schedule:
- DLR Falcon
Due to strong winds, today´s flight got cancelled!
- DLR HALO
Due to strong winds, today´s flight got cancelled!
- Radio Sondes
07:30 --- Work in the hangar
08:00 --- Start of 1st Radio Sonde
14:00 --- Start of 2nd Radio Sonde
Meeting times for entry into the airport at Silver Gate
07:15 M. Bramberger, A. Senica, J. Quinting, M. Röthlisberger; Shuttle from Gate to Terminal: South Air
Tuesday, Oct 11, 2016¶
Aircraft schedule:
- DLR Falcon
No flight!
Work on ground.
Meeting times for entry into the airport at Silver Gate
09:15 E. Nagel, D. Woudsma ; Shuttle from Gate to Terminal: Engelbert
- DLR HALO
Flight got cancelled because of some problems in Cranfield. It should have been a coordinated flight with FAAM!
Work on ground. Fueling.
Responsibilities¶
Position | Name | Contact (Email) | mobile phone |
HALO/Falcon Campaign Steering Group: | X | X | X |
Scientific Manager: | Andreas Schaefler | andreas.schaefler[at]dlr.de | X |
Technical Manager: | X | X | X |
Chief Forecaster: | Paolo Ghinassi | pghinass[at]uni-mainz.de | X |
Instrument Manager: | Manuel Gutleben | manuel.gutleben[at]dlr.de | X |
Coordinator Ground-Based Observations: | Lucas Hoeppler | lucas.hoeppler[at]physik.uni-muenchen.de | X |
Mission Scientist (D-CMET) | Benjamin Witschas | benjamin.witschas[at]dlr.de | +354 8668270 |
Mission Scientist (D-ADLR) | Florian Ewald | florian.ewald[at]dlr.de | X |
Mission Scientist (ground) | Roman Attinger | roman.attinger[at]env.ethz.ch | X |
DLR-FX Operations | Stefan Hempe | stefan.hempe[at]dlr.de | +49 172 20 00 688 |
DLR-FX Project Manager | Katrin Witte | katrin.witte[at]dlr.de | +49 172 741 3066 |