Project

General

Profile

Wiki » History » Version 325

« Previous - Version 325/389 (diff) - Next » - Current version
Katrin Witte, 10/13/2016 05:01 AM


NAWDEX 2016 Campaign (HALO & Falcon)

This is the official blog for the NAWDEX campaign, a webpage that can be edited by all NAWDEX team members that are registered. The aim is to inform all NAWDEX participants and interested colleagues about the campaign and to share the planning material. If you need information about the international NAWDEX Project please refer to http://nawdex.org/ and for the HALO/Falcon Project please refer to http://www.pa.op.dlr.de/nawdex/

In case you should have any questions please contact: andreas.schaefler[at]dlr.de


NAWDEX daily campaign schedule

[last change: 13 Oct, 2016, 05:00 UT]

If not stated otherwise, all timings given below after September 18 are referring to UT, which is LT in Iceland.


Thursday, Oct 13, 2016

Aircraft schedule:

  • DLR Falcon

2 Flights planned for Thursday

09:45 --- Power on the aircraft
11:50 --- Pulling the aircraft out of the Hangar
12:35 --- Take-Off (approx. flight time 3:00h)
15:35 --- Landing

Scientific Crew: B. Witschas, C. Lemmerz

Falcon ATC Map
Falcon Flight Plan

16:30 --- Take-Off (approx. flight time 3:30h)
20:00 --- Landing

Scientific Crew: B. Witschas, O. Lux

Falcon ATC Map
Falcon Flight Plan

Meeting times for entry into the airport at Silver Gate

09:15 E. Nagel, B. Witschas, C. Lemmerz, O. Lux, D. Woudsma ; Shuttle from Gate to Terminal: Engelbert

10:45 R. Welser, S. Grillenbeck, M. Zöger ; Shuttle from Gate to Terminal: Katrin

  • DLR HALO

04:45 --- Power on the aircraft
07:00 --- Pulling the aircraft out of the Hangar
08:00 --- Take-Off (approx. flight time 08:45h)
16:45 --- Landing

Scientific Crew: F. Ewald (PI), S. Groß, T. Koelling, D. Ene, B. Brügmann, M. Jacob

HALO ATC Map
HALO Flight Plan

Meeting times for entry into the airport at Golden Gate

04:15 K. Witte, C. Grad, M. Wirth, M. Gutleben, L. Hirsch, M. Klingebiel; Shuttle from Gate to Terminal: Katrin

05:45 T. Koelling, L. Höppler, T. Carlsen, K. Wolf; Shuttle from Gate to Terminal: Katrin

Meeting times for entry into the airport at Silver Gate

06:45 S. Gemsa, M. Grossrubatscher, T. Leder, C. Mallaun, S. Storhas, F. Ewald, S. Groß, D. Ene, B. Brügmann, M. Jacob, H. Konow; Shuttle from Gate to Terminal: Katrin

  • Radio Sondes

07:30 --- Work in the hangar
08:00 --- Start of 1st Radio Sonde
14:00 --- Start of 2nd Radio Sonde

Meeting times for entry into the airport at Silver Gate

07:15 M. Bramberger, A. Senica, J. Quinting, M. Röthlisberger; Shuttle from Gate to Terminal: Katrin


Wednesday, Oct 12, 2016

Aircraft schedule:

  • DLR Falcon

Due to strong winds, today´s flight got cancelled!

  • DLR HALO

Due to strong winds, today´s flight got cancelled!

  • Radio Sondes

07:30 --- Work in the hangar
08:00 --- Start of 1st Radio Sonde
14:00 --- Start of 2nd Radio Sonde

Meeting times for entry into the airport at Silver Gate

07:15 M. Bramberger, A. Senica, J. Quinting, M. Röthlisberger; Shuttle from Gate to Terminal: South Air


Tuesday, Oct 11, 2016

Aircraft schedule:

  • DLR Falcon

No flight!
Work on ground.

Meeting times for entry into the airport at Silver Gate

09:15 E. Nagel, D. Woudsma ; Shuttle from Gate to Terminal: Engelbert

  • DLR HALO

Flight got cancelled because of some problems in Cranfield. It should have been a coordinated flight with FAAM!
Work on ground. Fueling.


Responsibilities

Position Name Contact (Email) mobile phone
HALO/Falcon Campaign Steering Group: X X X
Scientific Manager: Andreas Schaefler andreas.schaefler[at]dlr.de X
Technical Manager: X X X
Chief Forecaster: Paolo Ghinassi pghinass[at]uni-mainz.de X
Instrument Manager: Manuel Gutleben manuel.gutleben[at]dlr.de X
Coordinator Ground-Based Observations: Lucas Hoeppler lucas.hoeppler[at]physik.uni-muenchen.de X
Mission Scientist (D-CMET) Benjamin Witschas benjamin.witschas[at]dlr.de +354 8668270
Mission Scientist (D-ADLR) Florian Ewald florian.ewald[at]dlr.de X
Mission Scientist (ground) Roman Attinger roman.attinger[at]env.ethz.ch X
DLR-FX Operations Stefan Hempe stefan.hempe[at]dlr.de +49 172 20 00 688
DLR-FX Project Manager Katrin Witte katrin.witte[at]dlr.de +49 172 741 3066

Planning Summary Matrix (from 19 Sep 2016, 23:25 UTC)


Instrument and Aircraft Status Matrix (from 12 Okt 2016, 12:00 UTC)


Observation Coordination Matrix( from XX Sep 2016, XX:XX UTC)