Wiki » History » Version 348
« Previous -
Version 348/389
(diff) -
Next » -
Current version
Katrin Witte, 10/17/2016 11:24 AM
NAWDEX 2016 Campaign (HALO & Falcon)¶
This is the official blog for the NAWDEX campaign, a webpage that can be edited by all NAWDEX team members that are registered. The aim is to inform all NAWDEX participants and interested colleagues about the campaign and to share the planning material. If you need information about the international NAWDEX Project please refer to http://nawdex.org/ and for the HALO/Falcon Project please refer to http://www.pa.op.dlr.de/nawdex/
In case you should have any questions please contact: andreas.schaefler[at]dlr.de
NAWDEX daily campaign schedule¶
[last change: 17 Oct, 2016, 11:30 UT]
If not stated otherwise, all timings given below after September 18 are referring to UT, which is LT in Iceland.
Tuesday, Oct 18, 2016¶
Aircraft schedule:
- DLR Falcon
Ferry to Oberpfaffenhofen.
Scientific Crew: B. Witschas, C. Lemmerz
- DLR HALO
Ferry to Oberpfaffenhofen.
Scientific Crew: S. Groß, M. Gutleben, L. Hirsch, K. Wolf, T. Koelling, M. Klingebiel
Monday, Oct 17, 2016¶
Aircraft schedule:
- DLR Falcon
No Flight!
Packing and preparing for departure.
- DLR HALO
No Flight!
Packing and preparing for departure.
Sunday, Oct 16, 2016¶
Aircraft schedule:
- DLR Falcon
No Flight!
- DLR HALO
Day-Off!
Saturday, Oct 15, 2016¶
Aircraft schedule:
- DLR Falcon
2 Flights!
07:00 --- Power on the aircraft
09:20 --- Pulling the aircraft out of the Hangar
10:00 --- Take-Off (approx. flight time 03:30h)
13:30 --- LandingScientific Crew: B. Witschas, C. Lemmerz
Falcon ATC Map Flight 1
Falcon Flight Plan Flight 1Fueling
14:30 --- Take-Off (approx. flight time 3:30h)
18:00 --- LandingScientific Crew: O. Lux, C. Lemmerz
Meeting times for entry into the airport at Silver Gate
06:35 B. Witschas, E. Nagel, C. Lemmerz, D. Woudsma
08:30 R. Welser, S. Grillenbeck
12:30 O. Lux
- DLR HALO
05:30 --- Power on the aircraft
07:45 --- Pushing the aircraft out of the Hangar
08:45 --- Take-Off (approx. flight time 08:10h)
16:55 --- LandingScientific Crew: A. Schäfler (PI), T. Carlsen, M. Jacob, H. Konow, M. Gutleben, S. Groß
Meeting times for entry into the airport at Golden Gate
05:00 K. Witte, C. Grad, M. Wirth, F. Ewald, D. Ene, M. Klingebiel, L. Hirsch, B. Brügmann; Shuttle from Gate to Terminal: Katrin
Meeting times for entry into the airport at Silver Gate
07:30 S. Gemsa, M. Grossrubatscher, T. Leder, C. Mallaun, S. Storhas, S. Hempe, A. Schäfler, T. Carlsen, K. Wolf, T. Koelling, L. Höppler, M. Jacob, H. Konow, S. Gutleben, S. Groß; Shuttle from Gate to Terminal: Katrin, Stephan
Friday, Oct 14, 2016¶
Aircraft schedule:
- DLR Falcon
Day-off (if technical Problem with the fuel leakage can be solved today).
- DLR HALO
04:45 --- Power on the aircraft
07:00 --- Pulling the aircraft out of the Hangar
08:00 --- Take-Off (approx. flight time 06:00h)
14:00 --- LandingScientific Crew: F. Ewald (PI), Hirsch, M. Klingebiel, S. Groß, M. Gutleben, K. Wolf
Meeting times for entry into the airport at Golden Gate
04:15 K. Witte, C. Grad, M. Wirth, D. Ene, M. Jacob, H. Konow; Shuttle from Gate to Terminal: Katrin
Meeting times for entry into the airport at Silver Gate
06:45 S. Gemsa, M. Grossrubatscher, T. Leder, C. Mallaun, L. Höppler, T. Koelling, L. Hirsch, F. Ewald, M. Klingebiel, S. Groß, M. Gutleben, T. Carlsen, K. Wolf; Shuttle from Gate to Terminal: Katrin
- Radio Sondes
07:30 --- Work in the hangar
08:00 --- Start of 1st Radio Sonde
14:00 --- Start of 2nd Radio Sonde
Meeting times for entry into the airport at Silver Gate
07:15 M. Bramberger, A. Senica, Julia Mack; Shuttle from Gate to Terminal: Katrin
Thursday, Oct 13, 2016¶
Aircraft schedule:
- DLR Falcon
Flights had to be cancelled for today because of some technical problems with the aircraft (fuel leakage).
- DLR HALO
04:45 --- Power on the aircraft
07:00 --- Pulling the aircraft out of the Hangar
08:00 --- Take-Off (approx. flight time 08:45h)
16:45 --- LandingScientific Crew: F. Ewald (PI), S. Groß, T. Koelling, D. Ene, B. Brügmann, M. Jacob
Meeting times for entry into the airport at Golden Gate
04:15 K. Witte, C. Grad, M. Wirth, M. Gutleben, L. Hirsch, M. Klingebiel; Shuttle from Gate to Terminal: Katrin
05:45 T. Koelling, L. Höppler, T. Carlsen, K. Wolf; Shuttle from Gate to Terminal: Katrin
Meeting times for entry into the airport at Silver Gate
06:45 S. Gemsa, M. Grossrubatscher, T. Leder, C. Mallaun, S. Storhas, F. Ewald, S. Groß, D. Ene, B. Brügmann, M. Jacob, H. Konow; Shuttle from Gate to Terminal: Katrin
- Radio Sondes
07:30 --- Work in the hangar
08:00 --- Start of 1st Radio Sonde
14:00 --- Start of 2nd Radio Sonde
Meeting times for entry into the airport at Silver Gate
07:15 M. Bramberger, A. Senica, J. Quinting, M. Röthlisberger; Shuttle from Gate to Terminal: Katrin
Responsibilities¶
Position | Name | Contact (Email) | mobile phone |
HALO/Falcon Campaign Steering Group: | X | X | X |
Scientific Manager: | Andreas Schaefler | andreas.schaefler[at]dlr.de | X |
Technical Manager: | X | X | X |
Chief Forecaster: | Paolo Ghinassi | pghinass[at]uni-mainz.de | X |
Instrument Manager: | Manuel Gutleben | manuel.gutleben[at]dlr.de | X |
Coordinator Ground-Based Observations: | Lucas Hoeppler | lucas.hoeppler[at]physik.uni-muenchen.de | X |
Mission Scientist (D-CMET) | Benjamin Witschas | benjamin.witschas[at]dlr.de | +354 8668270 |
Mission Scientist (D-ADLR) | Florian Ewald | florian.ewald[at]dlr.de | X |
Mission Scientist (ground) | Roman Attinger | roman.attinger[at]env.ethz.ch | X |
DLR-FX Operations | Stefan Hempe | stefan.hempe[at]dlr.de | +49 172 20 00 688 |
DLR-FX Project Manager | Katrin Witte | katrin.witte[at]dlr.de | +49 172 741 3066 |