Project

General

Profile

Wiki » History » Version 364

Version 363 (Manuel Gutleben, 10/24/2016 07:54 AM) → Version 364/389 (Manuel Gutleben, 10/24/2016 07:54 AM)

h1. NAWDEX 2016 Campaign (HALO & Falcon)

This is the official blog for the NAWDEX campaign, a webpage that can be edited by all NAWDEX team members that are registered. The aim is to inform all NAWDEX participants and interested colleagues about the campaign and to share the planning material. If you need information about the international NAWDEX Project please refer to http://nawdex.org/ and for the HALO/Falcon Project please refer to http://www.pa.op.dlr.de/nawdex/

In case you should have any questions please contact: *andreas.schaefler[at]dlr.de*

---

h2. NAWDEX daily campaign schedule

_[last change: 18 Oct, 2016, 06:50 UT]_

If not stated otherwise, all timings given below after September 18 are referring to UT, which is LT in Iceland.

---

h3. Tuesday, Oct 18, 2016

*Aircraft schedule:*

* *%{color:red} DLR Falcon%*
>
>06:00 --- Power on the aircraft
>07:30 --- Pulling the aircraft out of the Hangar
>08:35 --- *Take-Off Keflavik* (approx. flight time 03:00h)
>11:35 --- *Landing Prestwick*
>
> Fueling
>
>12:30 --- *Take-Off Prestwick* (approx. flight time 02:10h)
>14:40 --- *Landing Oberpfaffenhofen* (16:40 LT Oberpfaffenhofen)
>
>*Scientific Crew:* B. Witschas, C. Lemmerz
>
>"Falcon ATC Map Flight 1":https://internal.wavestoweather.de/nawdex/attachments/download/474/D-CMET%20BIKF-EGPK%20-%20Map%20ATC%2018-10-1.pdf
>"Falcon Flight Plan Flight 1":https://internal.wavestoweather.de/nawdex/attachments/download/477/D-CMET%20BIKF-EGPK%20-%20Flightplan%2018-10.pdf
>
>"Falcon ATC Map Flight 2":https://internal.wavestoweather.de/nawdex/attachments/download/475/Map%20D-CMET%20EGPK-EDMO.pdf
>"Falcon Flight Plan Flight 2":https://internal.wavestoweather.de/nawdex/attachments/download/478/000%20%20Flightplan%20EGPK%20-%20EDMO.pdf
>
*%{color:green}Meeting times for entry into the airport at Golden Gate%*
>
%{color:green} **05:45** D. Woudsma, C. Lemmerz, B. Witschas; Shuttle from Gate to Hangar: Katrin%
>
*%{color:green}Meeting times for entry into the airport at Silver Gate%*
>
%{color:green} **06:20** R. Welser, S. Grillenbeck; Shuttle from Gate to Hangar: Katrin%
>
* *%{color:red} DLR HALO%*
>
>05:45 --- Power on the aircraft
>06:30 --- *Luggage of Crew to be at the aircraft*
>08:00 --- Pushing the aircraft out of the Hangar
>09:00 --- *Take-Off* (LT Keflavik; approx. flight time 06:00h)
>15:00 --- *Landing* (17:00 LT Oberpfaffenhofen)
>
>*Scientific Crew:* S. Groß, M. Gutleben, L. Hirsch, K. Wolf, T. Koelling, M. Klingebiel
>
>"HALO ATC Map":https://internal.wavestoweather.de/nawdex/attachments/download/472/Map%20ATC%20D-ADLR%20%20%2018-10-2016-Rev.1.pdf
>"HALO Flight Plan":https://internal.wavestoweather.de/nawdex/attachments/download/473/Flightplan%20D-ADLR%20%20%2018-10-2016%20(2).pdf
>
*%{color:green}Meeting times for entry into the airport at Golden Gate%*
>
%{color:green} **05:15** C. Grad, K. Witte, T. Leder M. Wirth, H. Konow, B. Brügmann, M. Jacob%
>
*%{color:green}Meeting times for entry into the airport at Silver Gate%*
>
%{color:green} **06:20** S. Gross, M. Gutleben, L. Hirsch, K. Wolf, T. Koelling, M. Klingebiel, M. Höppler, T. Carlsen%
%{color:green} **07:30** S. Gemsa, M. Grossrubatscher, S. Hempe, S. Storhas, M. Zöger%

---

h3. Monday, Oct 17, 2016

*Aircraft schedule:*

* *%{color:red} DLR Falcon%*

>*No Flight!*
>Packing and preparing for departure.
>
* *%{color:red} DLR HALO%*

>*No Flight!*
>Packing and preparing for departure.

---

h3. Sunday, Oct 16, 2016

*Aircraft schedule:*

* *%{color:red} DLR Falcon%*

>*No Flight!*
>
* *%{color:red} DLR HALO%*

>*Day-Off!*
>

---


h2. Responsibilities

| *Position* | *Name* | *Contact (Email*) | *mobile phone* |
| HALO/Falcon Campaign Steering Group:| X | X | X |
| Scientific Manager: | Andreas Schaefler | andreas.schaefler[at]dlr.de | X |
| Technical Manager: | X | X | X |
| Chief Forecaster: | Paolo Ghinassi | pghinass[at]uni-mainz.de | X |
| Instrument Manager: | Manuel Gutleben | manuel.gutleben[at]dlr.de | X |
| Coordinator Ground-Based Observations: | Lucas Hoeppler | lucas.hoeppler[at]physik.uni-muenchen.de | X |
| Mission Scientist (D-CMET) | Benjamin Witschas| benjamin.witschas[at]dlr.de | +354 8668270 |
| Mission Scientist (D-ADLR) | Florian Ewald | florian.ewald[at]dlr.de | X |
| Mission Scientist (ground) | Roman Attinger | roman.attinger[at]env.ethz.ch | X |
| DLR-FX Operations | Stefan Hempe| stefan.hempe[at]dlr.de | +49 172 20 00 688 |
| DLR-FX Project Manager | Katrin Witte | katrin.witte[at]dlr.de | +49 172 741 3066 |


----

h2. Planning Summary Matrix (from 19 Sep 2016, 23:25 UTC)

----

h2. Instrument and Aircraft Status Matrix (from 13 Okt 2016, 11:10 UTC)

!{width:60%}NAWDEX_instrument_status_matrix_20161013.png!

----

h2. Observation Coordination Matrix( from XX Sep 2016, XX:XX UTC)