Daily Report 2016 09 12 » History » Version 6

Version 5 (Redmine Admin, 09/12/2016 03:03 PM) → Version 6/15 (Redmine Admin, 09/12/2016 03:04 PM)

h1. Daily Report 2016 09 19

----

h2. Flight Plans for the next days

* 15 September: HALO Transfer flight to Iceland
* 17 September: Falcon Tranfer flight to Iceland

Transfer provides some flexibility to pursue NAWDEX aims:
* Overflight of surface stations
* Instrument calibration (radar) pattern
* Dropsonde transmission check
* (adapted pattern in case of interesting weather situation)

----



h2. Weather Summary

See flight planning meeting slides of today: attachment:NAWDEX_Flight_Planning_Meeting_12092016.pdf

----


* Weather systems on Thu do not look promising for NAWDEX aims > plan for transfer with overflights and without extending the flight
* Low total cloud coverage predicted for Jülich and Chilbolton for Thursday, 12 UTC
* Clouds at all altitude predicted near Icleland and Buoy K7
* Wind speeds and wave heights are predicted to be low near Buoy 7 > plan for calibration circle near buoy K7
* Saturday is a transition day until the next system arrives Sun/Mon (former tropical cyclone)

----

h2. Planning Summary

_Here we will add a short summary about the planning meeting of the day
Here we will add the planning material as attached documents_
* _Planning Meeting presentation_

----

h2. Instrument summary

_Here we will add a short summary about the status of the instruments_
* _HALO:_
* _Falcon:_

----

h2. Mission summary

_On a Mission day you will find the Mission summary by the Mission PI here_

----

h2. [[Campaign Report]]: A view in NAWDEX world on XX Sep by X