NAWDEX 2016 Campaign (HALO & Falcon)¶
This is the official blog for the NAWDEX campaign, a webpage that can be edited by all NAWDEX team members that are registered. The aim is to inform all NAWDEX participants and interested colleagues about the campaign and to share the planning material. If you need information about the international NAWDEX Project please refer to http://nawdex.org/ and for the HALO/Falcon Project please refer to http://www.pa.op.dlr.de/nawdex/
In case you should have any questions please contact: andreas.schaefler[at]dlr.de
NAWDEX daily campaign schedule¶
[last change: 19 Sep, 2016, 16:35 UT]
If not stated otherwise, all timings given below after September 18 are referring to UT, which is LT in Iceland.
Wednesday, Sept 21, 2016¶
- Tentative schedule:
- DLR Falcon
12:15 --- Power on the aircraft
13:25 --- Power off
13:35 --- Leave hangar / APU power / refueling
14:50 --- Take-Off
Meeting with HALO at N 66°42' W 18°18' at 15:25 UTC
ETA Keflavik: 18:30 UTC
- DLR HALO,
10:00 --- Power on the aircraft
12:25 --- Power off
12:30 --- Leave hangar / APU power / refueling
13:45 --- Take-Off
Satellite Overpass at N 65°00' W 22°00' at 14:40 UTC
Meeting with DLR Falcon at N 66°42' W 18°18' at 15:25 UTC
ETA Keflavik: 18:45 UTC
Tuesday, Sept 20, 2016¶
Aircraft
- Falcon
10:00-19:30 --- Access to aircraft / power on the aircraft
- HALO
10:00-19:30 --- Access to aircraft / power on the aircraft
10:15 Briefing at the aircraft for planning of instrument work on the day
Monday, Sept 19, 2016¶
Meetings
- 08:30 --- Campaign Kick-off meeting (Operations Center)
Agenda:- de-briefing of Saturday’s flights * scientific introduction into the campaign * logistics/safety at Keflavik airport * regulations for work at both aircraft * typical daily schedule
- 11:00 --- General flight planning meeting at Operations Center (scientists)
- 12:30 --- Flight planning meeting at Operations Center (pilots/ops/mission scientist only)
Aircraft
- Falcon
approx. 10:30-18:00 --- Access to aircraft / power on the aircraft
- HALO
approx. 10:30-18:00 --- Access to aircraft / power on the aircraft
10:45 Briefing at the aircraft for planning of instrument work on the day
Sunday, Sept 18, 2016¶
- Day-off, no access to aircraft
Responsibilities¶
Position | Name | Contact (Email) | mobile phone |
HALO/Falcon Campaign Steering Group: | X | X | X |
Scientific Manager: | George Craig | george.craig[at]lmu.de | X |
Technical Manager: | X | X | X |
Chief Forecaster: | Christian Grams | christian.grams[at]env.ethz.ch | X |
Instrument Manager: | Manuel Gutleben | manuel.gutleben[at]dlr.de | X |
Coordinator Ground-Based Observations: | Ben Harvey | b.j.harvey[at]reading.ac.uk | X |
Mission Scientist (D-CMET) 21. Sep | Oliver Reitebuch | X | X |
Mission Scientist (D-ADLR) 21. Sep | Florian Pantillon | florian.pantillon[at]kit.edu | X |
Mission Scientist (ground) 21. Sep | Julian Quinting | julian.quinting[at]monash.edu | X |
DLR-FX Operations | Frank Probst | frank.probst[at]dlr.de | +49 152 015 22 498 |
DLR-FX Project manager in Keflavik (until Sep 30) | Andreas Minikin | andreas.minikin[at]dlr.de | +49 174 951 1618 |
DLR-FX Project manager in Keflavik (from Sep 30) | Katrin Witte | katrin.witte[at]dlr.de | +49 172 741 3066 |